 694 Study of the Rate of Deterioration of Bridges and Pavements as Affected by Trucks
Dr. Ronnie Chowdhury, Clemson University, Report Date – December 21, 2013, FHWA-SC-13-05
Summary
Final Report
 693 Operational and Safety Characteristics of Lane Widths
Dr. Jennifer Ogle, Clemson University, Report Date – January, 15, 2015, FHWA-SC-15-01 
Summary
Final Report
 692 Real Time Measurement of Scour Depths around Bridge Piers and Abutments
Dr. Abdul Khan, Clemson University, Report Date – Jan. 2015, FHWA-SC-14-05
Summary
Final Report
 691 Improving Techniques to Estimate the Magnitude and Frequency of Floods on Urban Streams in SC, NC, and GA
Toby D. Feaster, Anthony J. Gotvald, & J. Curtis Weaver, USGS, Report Date – March  2014, Scientific Investigations Report 2014–5030
Summary
Final Report
IBRD Testing of Connections between Prestressed Concrete Piles and Precast Concrete Bent Caps
Dr. Paul H. Ziehl, University of South Carolina, Report Date – July 2011, Federal Project No. BR26 (011)
Final Report
 689 Impact of Coarse Aggregate Gradation on PCC Performance Properties
Dr. Prasad Rangaraju, Clemson University, Report Date – October 2013, FHWA-SC-13-03
Summary
Final Report
 688 Evaluating the Effect of Slab Curling on IRI for South Carolina Concrete Pavements
Dr. Andy Johnson, SCDOT, Report Date – October 2010, FHWA-SC-10-04
Summary
Final Report
 687 Evaluation of Open-Graded Friction Courses: Construction, Maintenance, and Performance
Dr. Brad Putman, Clemson University, Report Date – October 2012, FHWA-SC-12-04
Summary
Final Report
 686 Improvement to Acceleration Design Response Spectra (ADRS) for Seismic Design of Transportation Structures in South Carolina
Dr. Ronald Andrus, Clemson University, Report Date – November 15, 2014, FHWA-SC-14-02 
Summary
Final Report
 685 The Relationship of SCDOT Damage Claims and Lawsuits to Roadway Engineering Safety Issues
Dr. Ronnie Chowdhury, Clemson University, Report Date – October 2011, FHWA-SC-11-01
Summary
Final Report
 684 Evaluation of Utility Relocation Costs and Best Management Practices
Dr. Lansford Bell, Clemson University, Report Date – May 2014,  FHWA-SC-14-01
Final Report
 683 Cost Indexing of Construction Materials
Dr. Charles Pierce, University of South Carolina, Report Date – October 2012, FHWA-SC-12-06
Summary
Final Report
 682 Accelerated Bridge Construction – Precast Alternate for Flat Slab Spans
Dr. Bryant Nielson, Clemson University, Report Date – October 2013, FHWA-SC-13-04
Summary
Final Report
Dr. Prasad Rangaraju, Clemson University, Report Date – August 2014, FHWA-SC-13-04a
Summary
Final Report
 680 Investigation of Warm Mix Asphalt (WMA) Technologies and Increased Percentage of Recycled Asphalt Pavement (RAP) in Asphalt Mixtures
Dr. Brad Putnam, Clemson University, Report Date – October 2012, FHWA-SC-12-05
Summary
Final Report
 679 Characterization of Storm Runoff from Selected South Carolina Department of Transportation Maintenance Yards
Celeste A. Journey and Kevin J. Conlon, USGS, Report Date – February  2014, Scientific Investigations Report 2013–5175
Summary
Final Report
Appendix
 677 Investigate Simplifying Bridge Expansion Joint Design and Maintenance
Dr. Juan Caicedo, University of South Carolina, Report Date – October 2011, FHWA-SC-11-03
Summary
Final Report
 676 Evaluation of Communication Alternatives for Intelligent Transportation Systems (ITS)
Dr. Ronnie Chowdhury, Clemson University, Report Date – August 2010, FHWA-SC-10-03
Summary
Final Report
 675 Validation of Contractor HMA Testing Data in the Materials Acceptance Process
Dr. James Burati, Clemson University, Report Date – August 2010, FHWA–SC–10–02
Summary
Final Report
 674 Synthesis of Optimal Usage of Available Aggregates in Highway Construction and Maintenance
Dr. Bradley Putman, Clemson University, Report Date – November 2009, FHWA-SC-09-03
Summary
Final Report
 673 Field Evaluation of Temperature Differential in HMA Mixtures
Caleb Gunter, SCDOT, Report Date – May 2012, FHWA-SC-12-02
Summary
Final Report
 672 Behavior of Pile to Pile-Cap Connections Subjected to Seismic Induced Forces
Dr. Paul Ziehl, University of South Carolina, Report Date – June 2012, FHWA-SC-12-03
Summary
Final Report
 671 Mechanistic/Empirical Design Guide Implementation
Dr. Ron Baus, University of South Carolina, Report Date – June 2010, FHWA-SC-10-01
Summary
Final Report
 670 Geotechnical Materials Database for Highway Design
Dr. Charles Pierce, University of South Carolina, Report Date – December 2011, FHWA-SC-11-02
Summary
Final Report
 669 Guidelines for Pavement Marking Applications
Dr. Wayne Sarasua, Clemson University, Report Date – February 2012, FHWA-SC-12-01
Summary
Final Report
 668 Optimal Maintenance Crew Composition and Enhancement of Crew Productivity
Dr. Lansford Bell, Clemson University, Report Date – August 2008, FHWA–SC–08-03
Summary
Final Report
 667 Support for the Elimination of Roadside Hazards in an acceptable Clear Zone through the use of Collision Data
Dr. Jennifer Ogle, Clemson University, Report Date – September 2009, FHWA-SC-09-01
Summary
Final Report
 666 Maintenance Outsourcing Phase II: Improving the Maintenance Contracting Process
Dr. Lansford Bell, Clemson University, Report Date – November 2007, FHWA-SC-06-07
Summary
Final Report
 664 Techniques for Estimating Magnitude and Frequency of Floods in Rural Basins in SC
Mr. Noel Hurley, Jr., USGS, Report Date – September 2009, Scientific Investigations Report 2009–5156
Summary
Final Report
 663 Research the Barriers to Statewide Coordination of Transportation
Dr. Anne E. Dunning, Clemson University, Report Date – June 2007, FHWA-SC-07-02
Summary
Final Report
 662 Investigation of the Performance and Benefits of Class F Lightweight Self Consolidating Concrete (SCC)
Dr. Dimitris C. Rizos & Dr. Paul Ziehl, University of South Carolina, Report Date – October 2009, FHWA-SC-09-02
Summary
Final Report
 661 Best Practices for Developing the Engineer’s Estimate
Dr. Lansford Bell, Clemson University, Report Date – June 2007, FHWA-SC-07-03/ FHWA-SC-07-04
Final Report Part I
Final Report Part II
 660 Survey the Public to Assess their Perception of the Performance of the South Carolina Department of Transportation
Dr. Sandra J. Teel, University of South Carolina, Moore School of Business, Report Date – April 2006, FHWA-SC-06-04
Summary
Final Report
 659 Benefit Cost Analysis of Accelerated Incident Clearance
Dr. Ronnie Chowdhury, Clemson University, Report Date – April 2007, FHWA-SC-07-01
Summary
Final Report
 658 Better Management for Speed Control in Work Zones
Dr. Wayne Sarasua, Clemson University, Report Date – December 2006, FHWA-SC-06-10
Summary
Final Report
 657 An Assessment of South Carolina Road Users to Measure Public Knowledge and Understanding of Traffic Control Measures
Dr. Kim E. Alexander, Clemson University, Report Date – October 2008, FHWA-SC-08-04
Summary
Final Report
 656 Life Cycle Cost Analysis for Pavement Design
Dr. Prasad Rangaraju, Clemson University, Report Date – January 2008, FHWA-SC-08-01
Summary
Final Report
 655 Load Testing for Assessment and Rating of Highway Bridges – Phase III
Dr. Scott Schiff, Clemson University, Report Date – January 2006, FHWA-SC-06-08
Summary
Final Report
 654 Rapid Set Concrete Patching Materials for PCC
Dr. Prasad Rangaraju, Clemson University, Report Date – January 2008, FHWA-SC-07-07
Summary
Final Report
Implementation